Lockout/tagout procedure example: how to write one for a machine, step by step

OSHA doesn't want a lockout policy. It wants a procedure for each machine that tells the person holding the lock exactly where the energy comes from, where to cut it, and how to prove it's gone. Here is a finished one for a vertical baler, the four things the rule says it has to contain, and the way we write them in an afternoon.

See exactly what you'd get

The JHA plus a toolbox talk record, an inspection and more, in one PDF: five documents for a jobsite crew, or three for a plant. No watermark.

Which pack

It opens right away too. We send the pack, one note two days later, and nothing else. Privacy.

Plans from $199 a month. No per-person fees. 14 days free.

Rather have us write it? Two written programs ($295)

The four things every procedure must say

The rule is 29 CFR 1910.147(c)(4)(ii). It says the written procedure has to clearly and specifically outline four things. Everything else in a good procedure is there to make these four easy to follow.

  1. What it is for. The machine, by name and location, and the work it covers. "Baler BAL-02, shipping dock, all servicing and clearing of jams."
  2. The steps to shut down, isolate, block and secure it. Every energy source, with the exact isolation point for each. Not "turn off power." "Circuit breaker CB-7, gray box on the wall 3 ft left of the baler, handle to OFF."
  3. The steps to put on, take off and hand over the locks and tags, and who is responsible for them. Who locks, where, and what happens at shift change.
  4. How to test that it worked. What button to press, what should happen (nothing), and what to look at to be sure.

There is an exception in the rule for machines with one energy source that is easy to see and lock, with no stored energy and no history of accidents, where locking that one point shuts everything down. All eight conditions have to be true at once, and very few machines in a real shop pass that test. Write the one-page procedure anyway. It takes less time than the argument with the inspector.

A push button is not an isolation point. The rule says so in the definitions: push buttons, selector switches and other control-circuit devices are not energy isolating devices. The e-stop stops the machine. The disconnect isolates it. You lock the disconnect.

A finished example: vertical baler

This is the kind of machine that hurts people in warehouses and stores every year, and the kind many shops have never written a procedure for. Made-up facility, real energy sources. The format is the one we use: a two-sided placard posted on the machine, with a photo of the machine and of every isolation point.

MachineVertical baler, 60-inch
ID / locationBAL-02 · Shipping dock, east wall
Procedure coversAll servicing and maintenance: clearing jams inside the chamber, work on the ram, cylinder, hoses or doors, the wire-tie system, and cleaning behind guards
Locks required1 per authorized employee on E-1; H-1 and GR-1 take a tag · LOTO-001, Rev. 1 · Approved 03/12/2026 by the plant manager
#Energy sourceMagnitudeIsolation point and locationDevice and method
E-1Electrical480 V, 3-phase, 10 HP pump motorCircuit breaker CB-7 (locks only in OFF), gray enclosure on the wall 3 ft left of the baler, chest heightHandle to OFF. Breaker lockout on the handle, one padlock per person, tag. Wait for the pump motor to stop; no capacitors on this unit.
H-1HydraulicUp to 2,500 psi in the ram cylinder and hosesRam cylinder and hoses (no lockable valve). Pump on the left side; cylinder over the chamberNo lock: pressure bleeds to tank when the ram is down and the pump stops. Tag, plus the extra measure: CB-7 locked out, so the pump can't build pressure. Ram all the way down before CB-7 is opened; the gauge on the pump reads 0.
GR-1GravityPlaten, about 1,800 lbPlaten, all the way down, inside the chamberNo lock: all the way down, it can't fall. Tag, plus the extra measure: CB-7 locked out, so the ram can't be raised. If it must stay up for the work, the manufacturer's safety prop goes under it, pinned.
  1. Tell the people who use it. Notify the dock lead and anyone feeding the baler that it is going down for service.
  2. Shut it down normally. Close the loading door. Run the ram all the way down. Press STOP on the control panel.
  3. Isolate the electricity. Go to CB-7, the gray enclosure on the wall 3 ft left of the baler. Switch the breaker handle to OFF.
  4. Lock and tag. Put the breaker lockout on the handle, your padlock on the lockout, your tag on the padlock. Each person working on the machine adds their own lock.
  5. Deal with the stored energy. Wait for the pump motor to stop. Check that the gauge on the pump reads 0 and the platen is resting all the way down. H-1 and GR-1 can't take a lock, so hang a tag at each: CB-7 locked out is what keeps the pump from building pressure and the ram from rising. If the platen must stay up for the work, pin the manufacturer's safety prop under it, pin clip in place, and tug-test it before anyone reaches in.
  6. Verify. Press START and UP on the control panel. Nothing should happen: the power light stays off, the gauge stays at 0 and the ram doesn't move. Return the controls to OFF. Before anyone touches the motor leads, a qualified person does a live-dead-live test at the load side of CB-7.

Return to service. Tools and rags out of the chamber. Guards and doors back on. Everyone clear and told it is coming back. Each person removes their own lock and tag. CB-7 to ON. Run one empty cycle with the door closed and watch it.

Photos on the posted copy: the machine with the ID tag visible, CB-7 with the breaker lockout on, the gauge on the pump reading 0, and the platen all the way down.

How to write yours in an afternoon

  1. List the machines. Anything someone will ever reach into, work under, or open up: conveyors, presses, compressors, mixers, saws, packaging lines, dock levelers, HVAC units, the big panel. One procedure per machine, or one per identical model if the isolation points are the same.
  2. Walk each one with the operator and the mechanic. The operator knows what it does when it's running. The mechanic knows what it does when it isn't. Find every kind of energy: electrical, hydraulic, pneumatic, mechanical springs and flywheels, gravity, heat, steam, chemicals, water.
  3. Find the isolation point for each one. The disconnect, not the e-stop. The air supply valve and the bleed, not the regulator. The valve you can lock, not the one you hope stays closed. Number them and put a tag on the machine at each one so the procedure and the machine match.
  4. Take the photos. One of the machine, one of each isolation point with the lock on it. A photo settles "which gray box" forever.
  5. Write the steps in the order you'd do them. Notify, shut down, isolate, lock, release stored energy, verify. Then the restore steps. Short sentences. A new mechanic should be able to follow it without asking.
  6. Try it. Lock the machine out using only the paper. If you had to ask someone anything, fix the paper. Then press start with it locked. This is the verification step and it is the one that catches the backfeed, the second disconnect, and the capacitor nobody mentioned.
  7. Post it on the machine, and keep the master. The posted copy is for the person with the lock. The master, with the revision date and the annual inspection record, is for you and the inspector.

Locks, tags and who holds the key

  • Lockout locks are for lockout only. Not the toolbox, not the gate. Standardized by color or shape so everyone recognizes them, durable enough for the environment, and strong enough that taking one off takes bolt cutters, not a screwdriver. 1910.147(c)(5).
  • Every lock says whose it is. Name on the tag or on the lock. One key, in that person's pocket. Nobody gets a spare.
  • One lock per person. If four people are inside the machine, there are four locks on the hasp. Nobody's safety depends on someone else remembering they're in there.
  • A tag warns. A lock holds. Tagout alone is only allowed when the isolating device physically cannot be locked, and then you have to add something that does the same job: pull a fuse, block a valve handle, remove a coupling. 1910.147(c)(3).
  • Only the person who put a lock on takes it off. If they went home with the key, the rule has a path for removing it (1910.147(e)(3)): verify they are not in the plant, make every reasonable effort to reach them, and make sure they know before they come back to work. Write that path into your program and use it rarely.

The annual inspection nobody does

Once a year, for every procedure, an authorized employee who is not the one using the procedure watches someone lock out the machine with it, and reviews the procedure with each person authorized to use it. Then you write down the machine, the date, who was included, and who did the inspection. That is 1910.147(c)(6), and it is the paragraph most often cited after a lockout injury, because it is the one that would have caught the procedure that didn't match the machine anymore.

The practical way: put every machine on a calendar, two or three a month, and have the inspection be the retraining. Fifteen minutes at the machine with the paper in hand. Fix what's wrong the same day.

Training: three kinds of employees

WhoWhat they need to knowExample
AuthorizedHow to find the energy, isolate it, lock it, verify it, and restore it. The procedure for each machine they'll work on.Mechanics, electricians, the operator who clears jams
AffectedWhat lockout is, what the locks and tags mean, and that they never touch a locked device or try to start a locked machine.The operator, the people on the line
OtherThat the locks and tags exist, and they don't touch them.Office staff who walk through the shop, sanitation crew

Retrain when the job changes, the machine changes, the procedure changes, or the annual inspection shows somebody doing it wrong. Keep a record with the name and the dates. 1910.147(c)(7).

Shift changes, crews, contractors and cords

  • Shift change. The lock stays on. The incoming person puts theirs on before the outgoing person takes theirs off. Write that handoff into the procedure. 1910.147(f)(4).
  • Crews. Group lockout: one person is in charge, a group lock box or hasp holds the machine, and every person on the crew still has their own personal lock on the box. 1910.147(f)(3).
  • Contractors in your plant. You tell them your procedures. They tell you theirs. Your people follow whatever the contractor's lockout requires while they're there. Put it in the pre-job meeting and write down that it happened. 1910.147(f)(2).
  • Cord-and-plug tools. Unplugging counts, if the plug stays in the hands of the person doing the work. A plug in the wall across the room doesn't. 1910.147(a)(2)(iii)(A).
  • Minor adjustments during production. The rule allows them without lockout only when they are routine, repetitive and part of running the machine, and the machine has some other protection built in, like a guarded jog control. "We do it all the time" is not that. Most jam clearing needs the lock.
  • Testing with power on. Sometimes you have to energize to position something. The rule gives the sequence: clear tools and people, remove the locks, energize and test, then isolate and lock again before the work continues. 1910.147(f)(1).

What about construction?

1910.147 is a general industry rule. On a construction site OSHA enforces lockout through the construction standards: 1926.417 for electrical circuits and equipment (deenergized equipment rendered inoperative and tagged at every point where it could be energized), 1926.702(j) for concrete and masonry equipment like mixers, pumps and screens (locked out and tagged, tag reads "Do Not Start"), and the general duty clause for everything else. The expectation is the same thing you just read: a known isolation point, a lock, and a test. If your contracting business also has a shop, a yard with a crusher, or a fleet bay, that part is general industry and 1910.147 applies to it directly.

Mistakes we find on the first walk-through

  • A lock on the e-stop or the control switch. The machine is stopped, not isolated.
  • One lock for the whole crew, held by the lead. The person inside has nothing protecting them.
  • No verification step. Isolate, lock, reach in. The second disconnect on the other side of the wall was still on.
  • The procedure is in a binder in the office. Nobody on second shift has seen it.
  • The machine was modified and the procedure wasn't. A new air cylinder, a new feed, a new disconnect.
  • The annual inspection has never happened, or it's a signature on a form and nobody went to the machine.
  • Contractors doing work on your equipment without being told about your procedure, and your people not told about theirs.
  • Someone else's lock cut off because they went to lunch.

Build the procedure with a photo of every isolation point

29Safety has lockout templates for conveyors, presses, compressors, packaging lines, panels, generators and more. You pick the machine, photograph each isolation point from your phone, and it prints the procedure and a placard for the machine in English and Spanish. The annual inspection and the training records sit next to it.

See exactly what you'd get

The JHA plus a toolbox talk record, an inspection and more, in one PDF: five documents for a jobsite crew, or three for a plant. No watermark.

Which pack

It opens right away too. We send the pack, one note two days later, and nothing else. Privacy.

Plans from $199 a month. No per-person fees. 14 days free.

Rather have us write it? Two written programs ($295)

Tell us what you think, get 50% off a package

Questions we get

Do I need a written lockout procedure for every machine?

Yes, with one narrow exception: a machine with a single energy source that is easy to identify and lock, no stored energy, no history of accidents, and locking that one point shuts the whole thing down, all at the same time (29 CFR 1910.147(c)(4)(i) and its note). Almost nothing with a hydraulic circuit, an air line or a raised load qualifies. Write the one page.

Can we use tags instead of locks?

Only when the energy isolating device physically cannot accept a lock, and then you have to add another measure that gives the same protection, such as removing a fuse or blocking a valve handle (1910.147(c)(3)). If the disconnect can take a lock, you lock it. In the baler above, H-1 and GR-1 can't take a lock, so each gets a tag, and CB-7 locked out is the extra measure.

Who can remove a lock?

The person who put it on. If they are gone and cannot be reached, the employer can remove it under a written procedure that includes verifying they are not in the facility, making every reasonable effort to contact them, and telling them before they return to work (1910.147(e)(3)).

How often does the procedure have to be reviewed?

At least once a year, by an authorized employee other than the one using it, watching the procedure performed and reviewing it with each authorized employee. Record the machine, the date, the employees included and the inspector (1910.147(c)(6)). Also any time the machine or the job changes.

Does lockout/tagout apply to construction?

Not directly: 1910.147 covers general industry. On a construction site OSHA uses 1926.417 (electrical), 1926.702(j) (concrete and masonry equipment) and the general duty clause, and expects the same thing: isolate, lock, verify. A contractor's shop or yard is general industry and falls under 1910.147.

What about tools that plug in?

Unplugging is enough when the plug is under the exclusive control of the person doing the work, meaning they can see it and nobody else can reach it (1910.147(a)(2)(iii)(A)). If the plug is across the room or behind a panel, lock it out with a plug lockout device.