29Safety

MIOSHA Part 1, R 408.40114

MIOSHA accident prevention program for Michigan construction

The contents page of a finished company safety manual from 29Safety, for a made-up sample company

Plans from $199 a month. No per-person fees. 14 days free.

Rather have us write it? Two written programs ($295)

Written by a safety team holding BCSP STS and NFPA 70E credentials.

See a finished oneTalk to the safety team

MIOSHA requires construction employers to have an accident prevention program, with a copy at the worksite. Start from 29Safety's Safety & Health Program; Harli drafts the MIOSHA version as a custom program on any plan, for you to review.

What's in your MIOSHA program

Under Part 1 of MIOSHA's Construction Safety and Health Standard, every construction employer in Michigan must develop and maintain an accident prevention program, coordinate it with employees, and keep a copy at the worksite (R 408.40114). These are the parts the rule requires. Harli drafts each one, and the draft is saved in your account for you to review and sign.

Built with your crew, kept on site

A program you develop, maintain and coordinate with your employees, with a copy available at the worksite.

R 408.40114(1)

Tools and equipment

Instruction for each employee on the operating procedures, hazards and safeguards of the tools and equipment the job needs.

R 408.40114(2)(a)

Site inspections

Inspections of the construction site, tools, materials and equipment, so unsafe conditions that could create a hazard get eliminated. Your program says who inspects and how often.

R 408.40114(2)(b)

Recognizing hazards

Instruction for each employee in recognizing and avoiding hazards, and in the rules that apply to their work. Weekly toolbox talks in English and Spanish, signed on the crew's phones.

R 408.40114(2)(c)

Harmful substances

For anyone who handles poisons, toxic materials, caustics or other harmful substances: the hazards, safe handling and use, personal hygiene, protective measures and first aid.

R 408.40114(2)(d)

Plants, animals and insects

Where harmful plants, reptiles, animals or insects are known to be present: the hazards, how to avoid injury, and the first aid to use.

R 408.40114(2)(e)

Flammables and toxics

Anyone who handles flammable liquids, gases or toxic materials is instructed in safe handling and use, and made aware of what the MIOSHA standards require. Training records with alerts before a card expires.

R 408.40114(3)

Walk through a sample JHA or a sample toolbox talk, part by part.

Also in Part 1, on every job

A few more Part 1 rules sit right next to the accident prevention program. Your records in 29Safety help you keep up with them.

A first aider on site

A person with a valid first-aid certificate at the worksite, and first aid supplies at each jobsite, checked before each job and at least weekly. First aid and CPR cards sit in the training tracker, with alerts at 60, 30 and 7 days.

R 408.40132(3), (5), (6)

Medical help planned ahead

Prompt medical attention arranged before the project starts, a way to reach emergency services, and the site's location posted where the phone doesn't send it to 911. The site-specific safety plan carries the emergency information for each job.

R 408.40132(2), (7), (8)

Hazards reported right away

Employees must report hazardous conditions or equipment to you immediately. Your program says how, and near misses get logged in minutes.

R 408.40116

Damaged equipment out of service

A damaged or defective machine, tool or piece of equipment is marked unsafe and locked out, made inoperable or taken off the jobsite. A failed daily check pulls a unit out of service.

R 408.40115(1)
Three pages from the construction sample pack: a job hazard analysis, a toolbox talk record and a trench inspection

See exactly what you'd get

Five finished documents for a made-up jobsite crew, straight out of 29Safety: a job hazard analysis for a storm drain trench, a toolbox talk record the crew signed on their phones, a daily trench inspection, a competent person designation, and the prequalification packet a GC asks for. 21 pages, no watermark.

It opens right away too. We send the pack, one note two days later, and nothing else. Privacy.

Or look through 11 finished documents first, no email needed

From signup to a signed JHA before the first coffee break

  1. Tell us about your work

    Pick your trades, your state, and your crew size. Answer about 12 plain questions. No safety jargon.

    About 5 minutes
  2. Get your programs

    29Safety builds your written program, JHAs, and first month of toolbox talks, with the OSHA rule cited on every line. Edit anything.

    About 2 minutes
  3. Run it from the jobsite

    Crews sign off on their phones, even with no signal. Training alerts and your prequal packet stay current on their own.

    Every day after

One price for the whole company

No per-person fees and no setup charge. Every plan includes every feature; plans differ by how many workers they cover, how much Harli can do each month, and storage.

How the free trial works

  1. Day 1Sign up. Nothing is charged today. Build your first written program.
  2. Days 1 to 14Build your programs, JHAs, toolbox talks and records.

One trial per company. If the email address used to sign up already had a free trial, there is no trial: the plan starts, and is charged, the day you sign up.

Crew
Up to 10 workers
$199 a monthMonth to month. Cancel anytime.
Harli: 300 questions and 75 builds a month. 5 GB of storage.
Start your free trial (Crew)14 days free, then $199 a month.
Team
Up to 25 workers
$399 a monthMonth to month. Cancel anytime.
Harli: 600 questions and 150 builds a month. 10 GB of storage.
Start your free trial (Team)14 days free, then $399 a month.
Company
Up to 50 workers
$699 a monthMonth to month. Cancel anytime.
Harli: 1,500 questions and 300 builds a month. 25 GB of storage.
Start your free trial (Company)14 days free, then $699 a month.
Large
Up to 500 workers
$1,299 a monthMonth to month. Cancel anytime.
Harli: 3,000 questions and 500 builds a month. 100 GB of storage.
Start your free trial (Large)14 days free, then $1,299 a month.

A build is a document Harli writes for you: a JHA, a toolbox talk, a program. Prices in US dollars. Payments by Stripe.

Rather have us write it?

The 29Safety safety team writes your programs, manual and site plan, filled in with your company. No account needed: Two written programs ($295), Bid and prequal packet ($795) and Full safety program ($2,495).

Questions

Anything else: safetyteam@29safety.com, or book a free 15-minute call.

Who needs a MIOSHA accident prevention program?
Employers doing construction work in Michigan. Part 1 of the MIOSHA Construction Safety and Health Standard covers all employers and employees performing construction operations (R 408.40101), and R 408.40114 requires the accident prevention program.
How does the MIOSHA version get built?
You start from 29Safety's Safety & Health Program. Harli drafts the MIOSHA version as a custom program on any plan, with each part tied to R 408.40114, and saves it as a draft. You review it, edit anything, and sign it.
Is it in Spanish?
Written programs turn into their own Spanish version with one button. Talks, JHAs and every sign-in screen come in Spanish, and each worker picks their own language.
Does 29Safety guarantee we pass a MIOSHA inspection?
No, and be careful of any software that says it does. Harli drafts your program from the rule, with the section cited on every part so you can check it. You review it, and your people run it on the job.
How long does it take?
Your first written program is ready about 10 minutes after you sign up. Read the MIOSHA draft through and edit anything you want before you use it.

Your MIOSHA program, drafted for your review.

Your first written program is ready about 10 minutes after you sign up.